Kave Home
Location
Paris (75)
Type of space
Store
Project description
Client initial brief
For its flagship located on Boulevard Raspail in Paris, Kave Home aimed to create an iconic space that would fully embody its design universe and premium positioning.
Project ambitions:
-
Deliver a 1,500 sqm flagship store
-
Create a highly immersive brand experience
-
Appoint a partner with integrated expertise in fit-out, furniture, metalwork, and energy solutions
-
Deliver the project within a controlled 12-week schedule
This is the largest project delivered since the beginning of our collaboration, with four stores already completed together.
Challenges or constraints encountered
A Paris flagship of this scale requires a high level of technical and organisational expertise.
Key challenges included:
-
A large-scale site in a dense urban environment
-
A tight schedule for a 1,500 sqm project
-
Coordination of multiple trades
-
Premium level of finishes expected
-
Full-scope intervention across multiple technical work packages
A high-profile, structuring project requiring flawless execution
Solution proposed and implemented
To address these challenges, Groupe Pagès mobilised the full breadth of its expertise:
-
Overall project management across fit-out, furniture, metalwork, and energy divisions
-
Rigorous planning and scheduling over a 12-week timeframe
-
Seamless coordination between technical teams and the client
-
Installation of high-performance technical systems (HVAC, electrical, plumbing)
-
Manufacturing and installation of integrated furniture
-
Custom-designed metalwork elements
-
High-end finishes aligned with the flagship concept
Result: an exceptional retail space, fully reflecting the brand’s DNA and positioned as a benchmark location in Paris.
Building work
Total project area
1500 m2
Project duration
12 weeks
Testimony
“This flagship represents a major milestone in our collaboration with Kave Home.
The scale of the site, the demanding schedule, and the high standards expected in terms of finishes made this project a true challenge.The synergy between our fit-out, furniture, metalwork, and energy teams was key to delivering a result that met expectations. It is a project we are particularly proud of.”
James, Project Manager, Groupe Pagès










